Pile Cap Design

Pre-cast install 6.jpg

Pile Cap Design

When faced with the challenge of installing several large monopiles for a port upgrade, Dynamic decided to approach the problem differently.

Leveraging the heavy lift capability of The Dynamic Beast our engineering staff proposed pre-casting the entire pile cap and utilizing methods found in the oil and gas industry to complete the installation.

Pre-casting the pile cap allows for significant schedule savings, as the pile cap can be constructed in advance of pile driving de-coupling the items and increasing safety and execution certainty. 

You can learn more about Design Build here.