Year: 2016
Location: Vancouver Harbour, BC
Dynamic was contracted by EMS Tech Inc. to install a new 2800 metric tonne per hour travelling shiploader. Considerable efforts were made aligning rails prior to installation for the project saw Dynamic crews erect a transfer and drive tower, structural steel bents and trusses before the shiploader was lifted into place. Dynamic was also responsible for the civil works and rail alignment leading up to the project. Along with additional upgrades to Viterra Pacific’s bulk material handling systems and dust control the shiploader installations was a major component in the terminals ability to triple its capacity and accommodate larger “Post Panamax” vessels.