Dynamic were contracted to transport and install 18 piles, each weighing 51 Tonne and measuring 1.524 M diameter x 50 M long.
The Dynamic Beast mobilized down to the Port of Seattle for the load-out and transportation of two 890MT container cranes.
In the Winter of 2019 Dynamic was contracted to decommission a damaged container crane at the Port of Vancouver, within 5 hours of the initial call The Dynamic Beast, together with the crew, were mobilized and on site.
When faced with the challenge of installing several large monopiles for a port upgrade, Dynamic decided to approach the problem differently.
Dynamic was contracted by Alliance Grain Terminal (AGT) to upgrade existing bulk material facilities upstream of a newly installed 2000 metric-tonne-per-hour ship-loading system.
In conjunction with the AGT Balance of Plant project Dynamic was commissioned, together with EMS Tech, to assist AGT with the complete demolition and installation of the new ship loading system.
Consisting of 3 different phases The Dynamic Beast was instrumental to the success of the Johnson Bridge project.
Dynamic was contracted by EMS Tech Inc. to install a new 2800 metric tonne per hour travelling shiploader. Considerable efforts were made aligning rails prior to installation for The project saw Dynamic crews erect a transfer and drive tower
In the Spring of 2018 DYNAMIC was contracted to pickup and launch two new build tug boats for Island Tug and Barge.