Year: 2017
Location: Victoria, BC
Objective: Convert the North Star to a duel-fuel operation on liquefied natural gas (LNG).
Synopsis: Lift heavy modules from the dock to the ship to operate on a dual fuel propulsion system.
Project: The Dynamic Beast was commissioned to lift Block A with a weight of 192.6 metric tons and Block B with a weight of 270.2 metric tons as well as the 2 LNG tanks each with an estimated weight of 156 metric tons.