In the Winter of 2019 Dynamic was contracted to decommission a damaged container crane at the Port of Vancouver, within 5 hours of the initial call The Dynamic Beast, together with the crew, were mobilized and on site.
In conjunction with the AGT Balance of Plant project Dynamic was commissioned, together with EMS Tech, to assist AGT with the complete demolition and installation of the new ship loading system.
The Dynamic Beast was commissioned to lift Block A with a weight of 192.6 metric tons and Block B with a weight of 270.2 metric tons as well as the 2 LNG tanks each with an estimated weight of 156 metric tons.
Swire Shipping acquired the services of The Beast in order to lift an Electrical Transformer that weighed a mighty 98 tons from the MV Hunan and place it onto the dock at Fraser Surrey Docks.